What are the reasons for the long delivery time of the conveying screw? Risks and countermeasures for delivery timelines in the beverage line.
"The screw takes two months," poses a risk for the launch of the new product.
For limited-time beverages, the release date is predetermined. However, as product planning and manufacturing schedules progress, if it turns out that "the delivery time for the conveyor screw takes two months," the delivery time for the screw could directly affect the schedule for launching the production line. 【Why is the delivery time for screws often long?】 There are three main reasons. 01 | Limited number of companies that can manufacture them Due to their special shape, specialized processing know-how is required. 02 | Equipment is needed for long-length processing Depending on the size, there may be limited processing equipment available. 03 | Concentration of orders Since the release date for limited-time products is fixed, demand tends to concentrate. Furthermore, delivery times are not determined solely by processing time. There are several steps involved: estimation → order → waiting for production → processing → inspection → shipping, and if the waiting time before production starts is long, the overall delivery time will also extend. At Equal Co., Ltd., we utilize an overseas production system to deliver conveyor screws within an average of one month. We confirm the desired delivery date, specifications, quantity, size, etc., and consider the feasibility of production.
- Company:イコール 本社・営業部
- Price:Other